Altronix NetWay16M Guía de instalación Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
NetWay8M/ NetWay16M - 11 -
Wall Mount Installation
1-Installmountingbrackets(A)ontheleftandrightsideofrackchassis using
four(4)flatheadscrews(B)(included)(Fig. 9a).
2- Place unit at desired location and secure with mounting screws
(not included) (Fig. 9b).
Caution: It is necessary to
makesuremountingscrews
are securely fastened to a
beam when installing the
unit vertically.
B
A
Mounting Options:
Fig. 8
Rack Mount Installation
1- Removeanddiscardfactoryinstalledscrewsfrombothsidesofrackchassis(Fig. 8a).
2-Installmountingbrackets(A)ontheleftandrightsideofrackchassis using the
four(4)flatheadscrews(B)(included)(Fig. 8b).
3- PlaceunitintodesiredEIA19”rackpositionandsecurewithmountingscrews(not included) (Fig. 8c).
Fig. 10
Fig. 9
Shelf Installation
1- Position and affix rubber pads (C) (included) at each
corner on the bottom of the unit (Fig. 10).
2- Place unit in desired location.
B
A
C
Mounting Hardware (Included):
Fig. 9b
Fig. 9a
C
A
B
Fig. 8b
Fig. 8a
Fig. 8c
Top Top Top
Front
Left
Front
Left
FrontLeft
LeftSide
RubberPad
Two(2)mountingbrackets
Six(6)flatheadscrews
formountingbrackets.
Four(4)rubberpads.
Remove
Dotted lines indicate studs
behind sheetrock.
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios